Huyssen MS Series power supply automatic test system

Huyssen Power MS series power supply test system is a convenient and practical automatic test system designed for power supply development and production test requirements. It can measure the technical parameters of power supply modules or other power products, evaluate the performance of power supply modules, and record products’ parameter. Users can choose different types of programmable AC/DC power supplies and programmable electronic loads according to their own test requirements to meet the test items of power supplies from different specifications.

Application fields:

Switching power supply test

Communication power test

system structure

DC-DC power supply test

Mobile power test

Aviation power test

UPS test,etc.

Features

● Intelligent human-computer interaction interface

● The working mode and parameters can be set through the software test platform

● Support one-key import/save system parameters

● Real-time display of test status and parameters

● Support Excel save function

● With automatic save function

● Support historical data search and access

Hardware equipment

MS series AC power supply

It adopts PWM frequency conversion method to achieve high level and high efficiency output. The single machine power of this series can reach 12KVA, and it supports master-slave parallel operation.

MS series wide range programmable system DC power supply

It is used for overvoltage and overcurrent testing, and provides up to 40 models, with a single machine power up to 30KW.

MS series DC electronic load

Provide 800W~50KW input power range to meet the test requirements, and have flexible dynamic modes such as dynamic and list.

MS series auxiliary DC power supply

For low-voltage power supply, it can provide 200~400W output power, has excellent output accuracy and high confidence, and can display a wealth of test and measurement information.

For more information, please feel free to contact us.

power supply used in charging pile test system2

Post time: Feb-06-2021